Skip to main content Skip to site footer
Club News

GALLERY: Latest photos from pitch renovation work at Ryton

26 July 2023

Club News

GALLERY: Latest photos from pitch renovation work at Ryton

26 July 2023

Here at the latest photos from the extensive pitch work which is ongoing at Coventry City's Ryton training ground.

The Sky Blues are training on Pitch 2, with the work ongoing on Pitch 1.

Since our last update at the start of this month, there have been a huge amount of changes.

The bank at the top of the pitch has been totally removed and the usable land at the training ground increased significantly.

Drainage is now being installed right across Pitch 1 and the surface being prepared for the stitching of the new pitch. Preparations are also ongoing for the new teqball area, close to the Lodge building, which will be an all-weather surface.

The new irrigation tank is now in place too, while delivery has also been taken of new goals as well.

Finally, extensive piling work is underway as a means to provide stability to the land around the training pitches and Ryton site.


Advertisement block

iFollow Next Match Tickets Account