Skip to main content Skip to site footer
Club News

GALLERY: Update on the pitch renovations at Ryton

5 July 2022

Club News

GALLERY: Update on the pitch renovations at Ryton

5 July 2022

While the Coventry City squad have been in Spain training, work has been progressing on the pitch renovations at Ryton.

The synthetic carpet is now largely in place on pitch 1 at the Sky Blue Lodge, with only the boxes yet to be completed.

That follows the installation of drainage and new pop up sprinklers, with the grass then set to grow on pitch 1 next before it is ready for use by the squad.

Mixto is the surface being installed at Ryton - this is a reinforced natural hybrid surface, specifically designed to serve a variety of needs for sports surfaces. It consists of a synthetic and a natural grass component, where the artificial matrix is perfectly designed to better promote the initial germination, growth and development of the natural grass. 

Mixto’s composite system creates the right conditions for perfect oxygenation, the permeability of the surface layer and an ideal air-water-soil balance, whilst also preventing the formation of muddy areas or waterlogging. Mixto also provides stability, permeability, and maximum safety for players.


Advertisement block

iFollow Next Match Tickets Account